Kitchen Cabinet Installation – Step-By-Step Instructions on How to Install Kitchen Cabinets Yourself

Cabinet

kitchen cabinets in fort lauderdale – Now you have your kitchen cabinets, you’re all set to proceed to the upcoming huge step….Installing your kitchen cabinets. While the actual setup of this Kitchen Cabinets isn’tall that tough, the crucial initial step is measuring and marking out where the cupboards will proceed. By putting design markings on the walls and flooring, it won’t just aid you with kitchen cupboard placement and stud places, but additionally, it will enable you to find where alterations and shims will probably be required. Before we begin you’ll find a couple of items You Will need for your job:

Pencil

Amount or Laser Level

Drill

Tape Measure

Stud Finder

Clamps

1″ x 3″ Piece of timber (6′-8′ in length) or a Inverted U-shaped frame (see notes below)

Shims

Screws (long enough to move 1 1/2 into the studs)

Utility knife or chisel

Marking Compass

An Excess pair of hands (you Might Have to bribe among your buddies)

As I mentioned previously, you have the choice of working with a bit of 1′ x 3′ timber for the setup or building a framework to support the cupboards (I have included an image of a sample framework below). This may be produced from 2′ x 4 and ought to be tall enough to hold the base of your wall shelves. If you intend on installing more than 1 kitchen, I recommend the framework, but a bit of timber is going to do just fine if this is a 1 time event. In any circumstance, you’ll require another pair of hands to assist with the setup.

In this scenario we purchased (RTA) Ready-To-Assemble Kitchen Cabinets from RTA Kitchen & Bathroom Cabinet Store. Today the kitchen cabinets are all constructed, we’re all set to get started marking out our design lines. Many people today begin with the bottom cabinets, however we will begin with the wall cabinets. There’s no wrong or right way to begin, I simply prefer to get started with the upper cupboards.

1. Use a flat and a pencil to draw a parallel line throughout the wall about 3 inches up from the ground. Step down from this point, to the ground, and locate the flooring high stage (if it has one), and indicate a line in the point. From this point, Measure up 34 1/2 inches and then draw a level line throughout the wall to designate the cover of the bottom cabinets.

2. Now you’ve got the cover of the base cabinets indicated, measure up the next 19 1/2 inches plus a flat line throughout the wall to indicate the base of the wall cupboards. Gently mark each closets’ measurements and positioning on the wall to ensure your original design is accurate.

3. Use a stud finder to find the wall studs. Use a pencil to mark the stud places at least 6 inches above and below the line to the base of the wall cabinets. Draw directly vertical lines between the upper and bottom marks to signify that the middle of the studs.

4. If you opted to go with this bit of 1′ x’ timber, today is where you’ll use (in case you opted to proceed with the U-shaped framework, then it is going to become involved after all of your traces are laid out). Twist a temporary 1′ x’ support rail to the wall, then aligning the upper edge of the railing with all the line for the base edge of the wall shelves. Attach it by forcing 4 or 3 2 inch screws through the railing to the wall studs.

5. Now that we’ve got all of the lines marked, now is the time to begin installing your kitchen cabinets. We will begin with the corner cupboard (this is where your helper’s additional set of hands will probably be required). Put the corner cupboard onto the temporary service railing and also have your helper hold the corner cupboard set up. Drill pilot holes through the rugged cabinet back or its own support railing and to the wall studs. Twist the cupboard into the wall with two screws which are long enough to penetrate the studs by at 1 1/2 inches. Examine the cover of the cupboard for flat along with also the front of the cupboard for plumb. In case you need to fix the place, back out the screws just a small piece and best shims behind the cupboard in the stud locations. When it’s plumb and level, then push the screws all of the way in and put in a few more in to each stud to make sure that the cupboard is fastened tightly to the wall.

6. Now we will move onto the cupboards on both sides of the corner cupboard. As you put in each one, use the clamps to fasten each cupboard to the neighboring cupboard and check it for plumb with your level. On faceframe cabinets, it’s a fantastic idea to drill two 1/8 inch pilot holes through the sides of this faceframe and apply screws. In cases like this, together with frameless, ready-to-assemble kitchen cabinets we’re likely to float through the plywood sides and use shims between the cabinets to ensure a tight match and be certain the cabinet faces are plumb.

7. Once all of the wall cabinets are set up, install the corner or finish base case cupboard. Use shims where required to level the cupboard and lift it up to the line that suggests the top point of this ground. Make sure it is flat from front to back and forth from side to side, then twist it to the wall studs. If you do not possess a diagonal corner cupboard or blind base cupboard in the corner, then push on the adjoining cabinet into position and clamp both units together. Insert a filler strip if desired to enable the drawers and doors sufficient clearance to start and shut correctly. If needed, tap shims beneath the cabinet and supporting it to correct for plumb and level.